https://online2.tingclass.net/lesson/shi0529/0008/8497/2239T.mp3
https://image.tingclass.net/statics/js/2012
1--So,now we have covered all the important points.
2--Yes.I think so.
1--Before we draft the contract.let'sexamine the details.
2--Ok.under this contract.we’ll supply youwith 600 dozen T-shirts.S,M and L equally assorted. at USD 100 per dozen.CFRLondon. Shipment in July. Payment by irrevocable sight UC.
1--Perfect. But what I’m concerned aboutmost is the time of delive。
2--You may rest assured thatshipment will be effected within the time limit stipulatad in the contract. Butthere is also one point I’d like to stress.
1-- Yes?
2-- Your UC must be opened at least onemonth before the time shipment: otherwise we won't be able to catch the ship.
1-- No problem. I’ll have the covering UCopened as soon as I getback. In addition. would you tell me by whom thecommodity inspection is conducted before shipment?
2-- The goods will be inspected by the ChinaImport & Export Commodity Inspection Bureau. It will then issue acertificate of quality and a certificate of weight. These will be taken asfinal and biding.
1-- Please remember to use both English andChinese versions and both versions should be equally valid.
2-- Naturally. Each of us keeps one oraginaland two copies.
1-- Then I’ll come along three days later toput my signature on it.
2-- Good.
===================================
注解:
1.important points重點
2.draft草稿
3.shipment裝運
===================================
譯文:
1--現(xiàn)在,所有的主要問題我們都已討論過了
2--我想是的
1--在起草之前,我們先檢查一下所有的細節(jié)
2--好的、根據(jù)這項合同,我們將向貴方出售600 打T恤衫,大、中、小號平均搭配,每打100美元,成本加運費倫敦價7月裝運,以不可撤銷的即期信用證付款。
1--完全正確,但我最擔(dān)心的是交貨時間。
2--你可以放心,貨物會在合同中規(guī)定的時間內(nèi)裝運。但我方也有一點想強調(diào)。
1--什么?
2--你方信用證必須在裝運前1個月開出,否則我們將趕不上船。
1--沒問題,我一回去,就馬上安排開立有關(guān)信用證。此外,您能告訴我們在裝船前這些商品是由誰負責(zé)檢驗么?
2-- 貨物由中國進出口商品檢驗局檢驗,然后出具質(zhì)量和重量證書。這些證明書將是最后的依據(jù)并具有約束力。
1--請記住用中英兩種文字結(jié)合,兩種文本同樣有效。
2--那當(dāng)然。雙方各保留一份原件和兩份復(fù)印件。
1--那么,三天后我來簽字。
2--好的。